Overhaul
We accept requests for maintenance and overhauls from customers who have installed our equipment. Please refer to the items below.
No.001 Preliminary investigation
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 4.0H | 
| Parts for Use and Replacement | Complete set of check samples | 
| Notes | Perform a status check on the equipment. | 
No.002 Infrared Lamp Replacement
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 0.5H | 
| Parts for Use and Replacement | Infrared lamp [1] | 
| Notes | The components used vary depending on the device specifications. | 
No.003 Replacement of the Fore-line Trap Element
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 0.5H | 
| Parts for Use and Replacement | Element: 20-H026-00-050 [1 can] | 
| Notes | The components used vary depending on the device specifications. | 
No.004 Rotary Pump Oil Change
| Implementation period | every six months | 
|---|---|
| Standard Work Time | 2.0H | 
| Parts for Use and Replacement | Rotary Pump Oil | 
| Notes | The components used vary depending on the device specifications and manufacturer. | 
No.005 Heated Sample Stage Replacement
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 2.0H | 
| Parts for Use and Replacement | Quartz stage, thermocouple, ICF gasket | 
| Notes | The components used vary depending on the device specifications. | 
No.006 Cleaning inside the heating chamber
| Implementation period | Implementation period | 
|---|---|
| Standard Work Time | 0.5H | 
| Parts for Use and Replacement | ICF gasket | 
No.007 Cleaning inside the load lock chamber
| Implementation period | Every two years | 
|---|---|
| Standard Work Time | 3.0H | 
| Parts for Use and Replacement | ICF gasket | 
No.008 Sample Transfer Mechanism Leaf Spring Replacement
| Implementation period | Every two years | 
|---|---|
| Standard Work Time | 1.0H | 
| Parts for Use and Replacement | Leaf spring, gasket | 
No.009 Infrared Guidance Mechanism Polishing
| Implementation period | Every two years (depending on the contamination status of the mechanical components) | 
|---|---|
| Standard Work Time | 1.0H | 
| Parts for Use and Replacement | Gasket | 
No.010 TMP(2)Bearing Replacement
| Implementation period | Every three years | 
|---|---|
| Standard Work Time | 3.0H | 
| Parts for Use and Replacement | Bearings, gaskets | 
| Notes | The components used vary depending on the device specifications. | 
No.011 Oil Mist Filter Replacement
| Implementation period | Every four years (depending on contamination levels) | 
|---|---|
| Standard Work Time | 0.5H | 
| Parts for Use and Replacement | Filter | 
No.012 Gate Valve Replacement
| Implementation period | Every four years | 
|---|---|
| Standard Work Time | 4.0H | 
| Parts for Use and Replacement | Gate valve, gasket | 
| Notes | Depends on the frequency of device usage. | 
No.013 Rotary Pump Replacement
| Implementation period | Every five years | 
|---|---|
| Standard Work Time | 2.0H | 
| Parts for Use and Replacement | Rotary pump, anti-vibration rubber | 
No.014 QMS Resolution and Mass Axis Adjustment
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 2.0H | 
| Parts for Use and Replacement | Calibration Standard Gas | 
No.015 QMS Ion Source Replacement
| Implementation period | Every two years (depending on contamination levels) | 
|---|---|
| Standard Work Time | 2.0H | 
| Parts for Use and Replacement | Ion source, gasket | 
No.016 Vacuum Start-Up and Baking Set
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 2.0H | 
No.017 Performance verification after overhaul
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 5.0H | 
| Parts for Use and Replacement | Complete set of check samples | 
| Notes | Maintenance will always be performed. | 
No.018 Measurement for QMS Calibration Curves
| Implementation period | Every month | 
|---|---|
| Standard Work Time | 1.0H | 
| Parts for Use and Replacement | Ion-implanted wafer | 
| Notes | Perform after baking for at least one day. | 
No.019 Measurement for QMS Characteristic Correction
| Implementation period | Every year | 
|---|---|
| Standard Work Time | 3.0H | 
| Parts for Use and Replacement | Ion-implanted wafers (various types) | 
| Notes | Perform after baking for at least one day. | 